Hydroelectric Power Stations

Powering Australia when it matters most

Hydroelectric Power Stations

AGL Hydro generates electricity to meet peak customer demand to help avoid power outages.

AGL Hydro’s ability to respond to rapid changes in customer demand is extremely valuable. Established from the breakup of the former State Electricity Commission of Victoria; AGL Hydro operates hydroelectric power stations in Victoria and NSW. Our three primary hydroelectric schemes are in the Kiewa, Dartmouth and Eildon catchments.

On a long-term average, AGL Hydro supplies approximately 1024 GWh pa, or about 2% of the electrical energy consumed in Victoria. While this is a small proportion of Victoria's electricity needs, AGL Hydro also provides crucial support to the electricity system in the event of peak demand periods or other generator outages.

The AGL Hydro Community Support Fund is now open

The Community Support Fund forms part of AGL’s commitment to support the communities where we have project activities.

A photo of four people gathered around a tablet, engaged in a conversation and smiling.

Location

Each of AGL Hydro's generating schemes are located on different river catchments. Using different catchment areas gives operational flexibility so we can maintain our customer commitments at any given time. Control of all generating plants is from a central facility situated at AGL’s 699 Bourke Street office enabling a rapid response to changes in demand.

Fire mitigation

AGL Hydro are committed to avoiding fire ignition caused by electrical assets as well as achieving compliance with relevant legislative and regulatory requirements while encouraging innovation, system improvement and the effective use of our flexible resources.

AGL Hydro’s policy is to mitigate as far as reasonably possible the risk of fire starting from those at-risk assets that AGL Hydro own. The Bushfire Mitigation Plan outlines the policies, procedures, standards, codes, and guidelines that AGL Hydro applies to construction, operation and management of our electrical infrastructure and sub-networks.

A snapshot of AGL's hydroelectric assets

 

AGL's main hydroelectric schemes

Scheme/Station Total capacity Average* annual output
Kiewa Scheme (VIC) comprised of:

  • McKay Creek Power Stations
  • Bogong Power Stations
  • Clover Power Stations
  • West Kiewa Power Stations
395 MW 404 GWh
Dartmouth Power Station (VIC) 185 MW 217 GWh
Eildon Power Station (VIC)  120 MW  184 GWh
A graphic showing the locations and capacities of hydroelectric schemes in Victoria, Australia, with Eildon at 120 MW, Dartmouth at 185 MW, and the Kiewa Scheme at 395 MW, represented by water droplet icons on a stylized map.

AGL's minor hydroelectric schemes

Scheme/Station Total capacity Average* annual output
Copeton Power Station (NSW) 22.5 MW 35 GWh
The Rubicon Scheme (VIC) 13.5 MW 64 GWh
Banimboola Power Station (VIC) 12.2 MW 11 GWh
Yarrawonga Power Station (VIC) 9.5 MW 50 GWh
Pindari Power Station (NSW) 5.7 MW 4 GWh
Burrendong Power Station (NSW) 19 MW 41 GWh
Glenbawn Power Station (NSW) 5.5 MW 12 GWh
Cairn Curran Power Station (VIC) 2 MW 2 GWh

 

  *Average annual output is based on each station’s commissioning date.

Stylized map highlighting hydroelectric power stations in Victoria and New South Wales, Australia, marked with blue droplets, including Yarrawonga, Cairn Curran, Rubicon Scheme, Pindari, Copeton, Glenbawn, Burrinjuck, and Banimboola, with a table listing their capacities to the left.

AGL's hydroeletric stations in detail

Community complaints and enquiries

AGL understands that we don’t always get it right, and we want to be informed when we don’t. If you would like to provide any feedback, good or bad, or simply ask some questions, please feel free to get in touch via the following channels:

telephone icon

Complaints and Enquiries Hotline

envelope icon

Mail

AGL Community Complaints & Enquiries,
Locked Bag 14120 MCMC,
Melbourne VIC 8001

Learn more  about how we handle general customer complaints on our complaints page.