About 1.35 million solar PV panels are soaking up the sun and converting it into energy here.

Nyngan Solar Plant

On an annual basis, the Nyngan Solar Plant will produce enough electricity to meet the needs of approximately 42,000 average Australian homes.

Nyngan Solar Plant is one of two large-scale solar photovoltaic (PV) power plants delivered by AGL in 2015, jointly funded by the Australian Renewable Energy Agency (ARENA) and the NSW Government.

The 102 MW solar plant in Nyngan, western New South Wales is expected to generate approximately 230,000 megawatt hours (MWh) of clean, renewable electricity each year.

Particulate and heavy metal emissions will also be reduced.

Location

Nyngan Solar Plant is located on an agricultural property about 10 km west of the Nyngan township, sitting on about 250 hectares of flat, rural land to the north of the Barrier Highway. There is a good buffer from Nyngan and nearby residents.

It's an ideal location. Nyngan receives strong and consistent solar radiation. Plus, it sits between the regional centre of Dubbo to the east and a number of mining loads at Cobar to the west – meaning that demand for electrical power is high. The existing Nyngan-Cobar 132 kV transmission line is just south of the site, allowing for relatively efficient connection into the electrical grid.

Nyngan Solar Plant map (PDF)

Tilt Renewables

On behalf of Tilt Reneweables (formerly Powering Australian Renewables Fund), AGL announced in November 2016 that it had reached financial close on selling its 102 MW Nyngan and 53 MW Broken Hill solar plants into the fund.

The AU$257 million sale, with approximately nil profit on sale, includes AGL writing a long term offtake agreement with the two solar plants.

Media release: Powering Australian Renewables Fund achieves first major milestone

Project delivery

AGL was responsible for the development and management of Nyngan Solar Plant. Construction began in January 2014 and was completed in mid-2015. The plant was officially opened in January 2016.

First Solar provided AGL with engineering, procurement and construction (EPC) services and is also maintaining the plant for its first five years of commercial operation. The electricity produced by the project will be sold under a power purchase agreement to AGL Hydro Partnership, a partnership between wholly owned subsidiaries of AGL.

How does the solar plant work?

First Solar's advanced cadmium telluride (CdTe) thin film photovoltaic (PV) modules convert sunlight into electricity, which is then fed into the electrical grid. This process generates electricity with no air emissions, no waste production and no water use, and has one of the smallest carbon footprints of any PV technology.

Some of the world's largest solar PV plants use First Solar PV modules. Indeed, over 7,000 MW of their modules are installed worldwide.

At Nyngan, about 1.35 million solar PV modules are installed on frames, supported by about 150,000 steel posts. These modules are at a fixed (non-tracking) tilt of 25 degrees, facing north. They are wired together in arrays, and connected to inverters which transform the DC current produced by the modules into AC current that feeds into the grid.

A 33/132 kV transformer converts output from the plant to grid voltage, and a short 3 km section of new 132 kV transmission line connects the solar plant's substation to the existing Nyngan-Cobar transmission line.

Generation

Generation from the Nyngan Solar Plant commenced on 21 March 2015. Full generation (102 MW) was achieved in June 2015.

The following information is provided for the calendar year 2016 (PDF) and calendar year 2017 (XLS):

  • actual generation from the solar plant during the AEMO trading interval
  • actual regional reference price for each trading interval
  • link to Green Energy Markets showing the LGC market prices.

The Nyngan Solar Plant is connected to the National Electricity Market (NEM) which is managed by the Australian Energy Market Operator (AEMO). For a glossary of terms associated with the NEM and mentioned in our report please refer to the AEMO website. The solar plant revenue is also subject to the Marginal Loss Factors (MLF) which are published each financial year by AEMO.

Report: Nyngan Generation (PDF)

Project benefits

During the construction period, up to 250 local construction jobs were generated. First Solar sourced as many of these jobs from Nyngan and the surrounding region as possible. They also maximised local and regional content in plant procurement and construction by sourcing local materials.

Local opportunities provided during plant construction included:

  • civil engineering and site preparation
  • post, racking, and module installation
  • high voltage power system works
  • communications and monitoring system works
  • construction and supervision roles
  • administration and construction support roles

Community complaints and enquiries

AGL understands that we don’t always get it right, and we want to be informed when we don’t. If you would like to provide any feedback, good or bad, or simply ask some questions, please feel free to get in touch via the following channels:

telephone icon

Complaints and Enquiries Hotline

envelope icon

Mail

AGL Community Complaints & Enquiries,
Locked Bag 14120 MCMC,
Melbourne VIC 8001

Learn more  about how we handle general customer complaints on our complaints page.