AGL joint submission on the Material change in network infrastructure project costs

AGL has made a joint submission to the Australian Energy Market Commission Material Change in Network Infrastructure Project Costs draft rule determination. The submission suggests that a material change in network infrastructure project costs can be subject to more rigour than the draft rule proposes without undermining the need for timely transmission investment in the NEM.

Read the full submission here.